Review Note

Last Update: 11/17/2023 12:08 PM

Current Deck: German A1

Published

Fields:

Front
Baustelle, die, -n
Back
Construction site, building site
ex:
1)Auf der Straße gab es eine Umleitung wegen einer Baustelle.(There was a diversion on the road due to a construction site.)
2)Ein Container voller Schutt stand vor der Baustelle.(A skip full of rubble stood in front of the building site.)

Suggested Changes:

Deck Changes (Suggestion to move the Note to the following Deck):

Field Changes:

Tag Changes: